projects

This is our 61st Luxelocker storage unit floor we have completed since 2022.
Another Luxelocker floor beautified and protected.

This couple just graduated from Boise State University, and as you can tell they love their school!

 We added copper in the brown flakes to the driveway, the brown matched the trim and the copper matched the copper roof above the home’s entrance.

First Class from start to finish

October 24, 2022

Robert and Pete did a first class job on our storage condo. All I had to do was pick the color and that did the rest. No need for me to even be on site as they accessed the unit, did a beautiful job and cleaned up after. They even came back and fixed the concrete cut for the sewer line at no extra costs. Super happy with their work and communication. Everything was fine timely and accurately. No reason to call anyone else.

Jeff S